Queen's Gazette | Queen's University

Search form

Water shutdown scheduled for Dupuis Hall

A full building water shutdown is scheduled for Dupuis Hall on Wednesday, Jan. 11 between 8:15 am and 10:15 am to permit Physical Plant Services to install valves for the eyewash station on the second floor of the building.

During the shutdown period, there will be no domestic hot or cold water available for hand washing, flushing toilets, safety showers, eye wash stations or lab equipment. There is a separate water feed to the standpipe system, so there are no fire safety implications arising from this work.

Any questions regarding this shutdown should be directed to Fixit by phone at ext. 77301 or by email.