The Isabel will be closed during a planned power outage on Tuesday, Jan. 6 between 6 am and 10 am while Utilities Kingston performs critical repairs to their overhead power system.
The passenger elevator (EL1941) and passenger lifts (EL1942 and EL1943) will be shutdown at 3:30 pm on Monday, Jan. 5 and will be restored to service at 10 am on Tuesday, Jan. 6. There are no fire safety implications arising from this outage as the fire alarm panel will remain powered by emergency power.
Building occupants are reminded to shutdown all computers and equipment prior to leaving for the day on Monday, Jan. 5.
Any questions or concerns regarding this planned outage should be directed to Fixit by phone at ext. 77301 or by email.