600 volt power within Ellis Hall will be shutdown on Friday, Dec. 19, 6 - 9 am, while contractors install a breaker for the new hydraulic pump in the structures lab.
Please keep the following information in mind as you plan for this shutdown:
- Walk-in coolers, 600 volt research equipment and some of the building ventilation will be affected during the shutdown period.
- Passenger elevator (EL1291) will be taken out of service on Thursday, Dec. 18 at 3:30 pm and will be restored to service on Friday, Dec. 19 at 9 am.
- The building lighting, power to work stations and the fire alarm system will remain operational while this work is completed.
Any questions or concerns regarding this planned work should be directed to Fixit by phone at ext. 77301 or by email.