Physical Plant Services

Physical Plant Services (PPS)

site header

**This Page is Under Construction**

Queen's Building Design Standards

General
  • Introduction
  • Drafting Standards
  • Review/Sign Off at Design Phase
  • Sustainability Standards
Queen's Facility Accessibility Design Standards (QFADS)
Coming Soon
Design Guidelines per Type of Space
  • Student Spaces (Lounge, Informal Study Spaces)
  • Classrooms
  • Laboratories & Support
  • Administrative Spaces
  • Service Rooms
Division 00  Procurement and Contracting Requirements
Coming Soon
Division 01  General Requirements
  • 01 00 00    General Service Requirements
  • 01 30 00    Administrative Requirements
  • 01 40 00    Quality Requirements
  • 01 50 00    Temporary Facilities, Services, and Controls 
  • 01 70 00    Execution and Closeout Requirements 
  • 01 91 00    Commissioning
Division 04  Masonry
  • 04 05 00    Common Work Results for Masonry
  • 04 05 13    Masonry Mortaring and Grouting
  • 04 21 13    Brick Masonry
  • 04 43 26    Quarried Stone Veneer
Division 05  Metals
  • 05 50 00    Metal Fabrication
Division 06  Wood, Plastics, and Composites
  • 06 10 00    Wood & Plastic Work
  • 06 40 23    Architectural Woodwork
Division 07  Thermal and Moisture Protection
  • ​07 20 00    Thermal Protection
  • 07 30 00    Shingles, Roof Tiles, and Covering
  • 07 40 00    Manufactured Siding and Cladding Panels
  • 07 50 00    Membrane Roofing and Parapets
  • 07 60 00    Sheet Metal Roofing
Division 08  Openings
  • 08 00 00    General Doors and Windows
  • 08 70 00    Door Hardware
  • 08 87 00    Glazing Surface Films​
Division 09  Finishes
  • 09 06 00    Schedules for Finishes
  • 09 30 00    Tile Work
  • 09 50 00    Acoustical Ceilings
  • 09 65 00    Resilient Flooring (Sheet and Tile)
  • 09 68 00    Carpeting (Tiles)
  • 09 70 00    Wall Coverings
  • 09 80 00    Acoustic Treatment
  • 09 90 00    Painting and Coating
Division 10  Specialties
  • 10 11 00    Whiteboards, Chalkboards, and Glassboards
  • 10 14 00    Signage
  • 10 21 00    Toilet Compartments
  • 10 22 19    Demountable Partitions
  • 10 22 23    Moveable Partitions
  • 10 28 10    Washroom Accessories
Division 11  Equipment
  • 01 11 00    Audio-Visual Equipment
Division 12  Furnishings
  • 12 20 00    Window Treatment
  • 12 35 00    Laboratory Furniture
Division 14  Conveying Systems 
  • 14 20 00    Elevators
Division 21  Fire Suppression
Coming Soon
Division 22  Plumbing
Coming Soon
Division 23  Heating, Ventilation, and Air Conditioning (HVAC)
Coming Soon
Division 25  Integrated Automation
Coming Soon
Division 26  Electrical
Coming Soon
Division 27  Communications
Coming Soon
Division 28  Electronic, Safety, and Security
Coming Soon
Division 31  Earthwork
Coming Soon
Division 32  Exterior Improvements
Coming Soon
Division 33  Utilities
Coming Soon
Division 40  Process Interconnections
Coming Soon